Personal tools
You are here: Home Technical Committees TC 5/SC 2 Archives
Log in


Forgot your password?
 
Document Actions

Archives

Up one level
List of the registered documents (N1) by Samuel Just, BIML — last modified 2008-03-03 13:47
 
2nd Committee Draft (N12) by Samuel Just, BIML — last modified 2008-03-03 13:47
The Second CD of OIML TC 5/SC 2 : "General Requirements for Software Controlled Measuring Instruments" (D-Sw) is being circulated within TC 5/SC 2. Comments and proposals for improvement must be provided to the TC 5/SC 2 Secretariat by 30 May 2008. In the meantime OIML TC 5/SC 2 P-Members are kindly invited to vote on the registration of the 2CD as a Draft Document.
1st Committee Draft (N9) by Samuel Just, BIML — last modified 2008-03-03 11:30
The First CD of OIML TC 5/SC 2 : "General Requirements for Software Controlled Measuring Instruments" (D-Sw) has been published today. Comments and proposals for improvement must be provided to the TC 5/SC 2 Secretariat by 30 September 2007.
1st Working Draft (N7) by Samuel Just, BIML — last modified 2008-03-03 11:41
We kindly ask you to study the Working Draft and give us comments and proposals for improvement until 31 May 2006. (POSTPONED to 30 September 2006)
Pre-draft version 0.25 (N6) by Samuel Just, BIML — last modified 2008-03-03 11:30
Version 0.25 of the pre-draft with all changes compared to version 0.11 marked by the MS-Word change mode
Pre-draft version 0.11 (N4) by Samuel Just, BIML — last modified 2008-03-03 11:31
This pre-draft is the output of your answers to the questionnaire, the analysis of existing OIML Recommendations and Documents, the analysis of existing regional software require-ments and software ISO/IEC standards, and of course the experience of the persons in-volved in the elaboration.
Evaluation of the members' comments to the Questionnaire (N3) by Samuel Just, BIML — last modified 2008-03-03 12:02
 
Answer of the TC 5/SC 2 members to Questionnaire (.zip file) by Samuel Just, BIML — last modified 2008-03-03 12:03
The objective of this questionnaire was to get impulses and ideas for the work of the sub-committee.
 

Powered by Plone